Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Abdul-Rahman, H (1996) Some observations on the management of quality amongst construction professionals in the UK. Construction Management and Economics, 14(06), 485-96.

Allen, S and Hinks, J (1996) Note - How long should housing last? Some implications of the age and probable life of housing in England: a comment. Construction Management and Economics, 14(06), 529-34.

Ranasinghe, M (1996) Total project cost under inflation: a simplified model for decision makers. Construction Management and Economics, 14(06), 497-504.

Singh, A and Shoura, M M (1996) Optimizing bidding success and profitability in airport runway construction in French Polynesia. Construction Management and Economics, 14(06), 505-28.

  • Type: Journal Article
  • Keywords: competitiveness; Monte Carlo; operating characteristic curve(OCC); probability; success; unit price
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461996373214
  • Abstract:

    Winning a bid and making a profit deeply influence the bidding philosophy of behaviour of a construction market. Estimators commonly calculate direct costs and add overheads and profit in what is a simple arithmetic exercise. This paper studies a database of bids submitted on airport construction in French Polynesia. By analysing the distribution of bid prices placed on elemental cost items, an optimal bid is determined for overall success and profitability through using statistical techniques such as operating characteristic curves and overrun profiles. It is seen that successful and profitable contractors have overall profitability indexes in the range of 0.205-0.341 in the French Polynesian construction market. Similar analyses can be conducted for other construction markets, which can give a contractor a better grasp over their estimating technique. This process assists owners in determining whether contractors are bidding within reasonable limits and whether the contractor is a safe or unsafe risk.

Tan, W (1996) Note - The elasticity of capital-labour substitution in Singapore construction. Construction Management and Economics, 14(06), 535-40.

Trinh, T T P and Sharif, N (1996) Assessing construction technology by integrating constructed product and construction process complexities: a case study of embankment dams in Thailand. Construction Management and Economics, 14(06), 467-84.